Celebrating 50 Years
Solar Ready

Solar Ready / ground mount

Ground-mount solar engineering, from site advice to full design.

Choose the structural scope for your fixed-tilt, tracker or PEG system. Compare services and published fees before you enquire.

The engineering scope

Choose your system and engineering scope.

Fixed-tilt ground-mounted solar concept with braced supports and concrete foundations

Fixed-tilt systems

Frames and foundations for panels at a fixed angle. Choose a review, footing design or full structural design.

Tracker systems

Engineering for the proposed moving array and its supports. Review and footing-design fees carry a 20% tracker adjustment.

See tracker pricing notes ↓

Jurchen PEG systems

System-specific assessment and certification for the site and configuration agreed in the scope.

See PEG certification ↓

Preliminary site assessment

For tender and feasibility planning.

Initial structural considerations and foundation recommendations. Send the site plan, superstructure reaction forces and geotechnical report.

$2,500AUD excluding GST

Compare fees ↓

Independent structural review

For manufacturers and EPC engineering teams.

Review the proposed fixed-tilt design against the agreed structural requirements, including AS/NZS 1170.2, with applicable Reg 126 or PS1 documentation.

From $2,000AUD excluding GST

Compare fees ↓

Footing design and independent review

For teams designing their own superstructure.

Gamcorp designs the foundations and footings, with independent review and applicable Reg 126 or PS1 certification.

From $2,000AUD excluding GST

Compare fees ↓

Full structural design and IFC drawings

For installers and developers needing the full design scope.

Concept and detailed structural design, issued-for-construction drawings, computation reports and construction support.

From $6,000AUD excluding GST

Compare fees ↓

Fees & scope

Compare the service fees.

These are different scopes of service, not steps to purchase in sequence. The selected scope and project information determine your quote.

Preliminary site-specific assessment

$2,500AUD excluding GST

Initial site advice and foundation recommendations for tender-stage planning.

Review, footing design or full structural design

Fixed-tilt price guide · AUD excluding GST
System sizeIndependent reviewFooting design & reviewFull structural design
Up to 250 kW$2,000$2,000$6,000
250 kW–1 MW$3,000$3,000$9,600
1–3 MW$4,000$4,000$14,400
3–5 MW$6,000$6,000$19,200
Over 5 MWQuote requiredQuote requiredQuote required

Tracker systems: add 20% to the independent review or footing design and review fees. Tracker full-design scope and fees are quoted for the proposed system.

Over 5 MW: request a project-specific quote.

All fees: Australian dollars, excluding GST. Your quote confirms the work, required information, documentation and exclusions.

Engineering in practice

What this helps clients do.

The process

From your brief to engineering documents.

  1. Share the information

    Send the available records, proposed arrangement and what you need to resolve.

  2. Agree the scope and fee

    Receive a quote defining the work, documents, exclusions and delivery timing.

  3. Receive the engineering documents

    Use the findings, design requirements and certification included in the agreed scope.

The scope, fee, required information and delivery timing are agreed before engineering work proceeds. Documents apply to the assessed arrangement and conditions.

Start with what you have

Make the next structural decision clear.

Send the project information

  • Site plan, proposed array capacity and system type: fixed-tilt, tracker or PEG
  • Available frame drawings, design calculations and geotechnical report
  • For preliminary assessment: superstructure reaction forces; include your project stage and required timing

Missing a drawing or detail? Tell us what is available so we can identify the next information needed.

Confirm your scope and fee

Share your project stage, the decision you need to make and your required timing.

Start your project

Search the site

Quick links