Celebrating 50 Years
Solar mounting rails and panels on a Coles store roof in Altona

Solar Ready · Australia

Engineering across the Coles network.

Working with Origin Energy across the Coles network.

Origin Energy and other project partners need structural answers for each Coles store, from roof capacity to installation loads. Gamcorp helps the teams plan around the existing building, review changes and define the conditions for the agreed work.

Coverage
Australia
Scope
Solar and other store engineering
Coles stores assessed
300+

ResultOrigin Energy and other project partners gained store-specific structural requirements to plan solar, installation loads and design changes across the Coles network.

The scale of the work

Repeat work. Individual attention.

Across the Coles network, our work includes roof assessments, site inspections, installation-load checks and repeat reviews as projects develop.

The volume brings familiarity with the work. It does not make the buildings interchangeable. Different roof structures, alterations and proposed installations each need their own assessment.

We work with multiple partners, bringing consistent structural advice to the requirements of each building.

The assessment process

From the roof to the supporting structure.

Roof sheets, rooflights and existing equipment at a Coles store

01 Inspect the roof

Document the roof layout, visible condition and existing equipment to inform the assessment.

Steel beams, bracing and connections beneath a plant platform above the roof at a Coles store

02 Identify the structure

Record the steelwork, supports and connections relevant to the proposed loads.

Tape measure recording the depth of a steel beam at a Coles store

03 Confirm the dimensions

Site measurements help establish member sizes for the structural calculations.

Site photographs illustrate parts of the assessment process. The inspection scope depends on the building and project.

What we do

Clear structural requirements for the project team.

Assess and inspect

Review drawings and building information, with site inspections and further investigation where the brief requires them. The aim is to understand the structure that is actually there.

Check loads and connections

Assess solar mounting, temporary panel storage and equipment supports within the agreed scope. The installation process can place different loads on the roof from the finished system.

Review connections and changes

Check mounting arrangements and revised layouts, then document the assessed conditions and certification for the agreed scope.

Why individual buildings matter

Look beyond a standard roof layout.

Investigate what needs a closer look

The work has included a roof deflection investigation and an invasive inspection of a roof built over another roof. These are different questions from a straightforward panel-load assessment.

Work through the installation details

Custom flashing, inverter stands and mounting connections also appear in the work. A solar layout is only part of the structural picture.

Review changes as the project develops

Repeat assessments cover revised layouts, flush-mounted systems and temporary pallet loads. Changes need to be checked against the assessed structure and documented requirements.

Coles projects

Our work across Australia.

Select a marker to view the store name.

Loading the store map…

Result for the client

Store-specific answers for a national programme

Origin Energy and other project partners could plan the structural side of each Coles project around the building involved. Roof findings, installation-load checks and reviewed layouts gave teams a basis for decisions about panel positions, mounting and temporary storage.

  • Plan for the actual roof: inspections and investigations established relevant structural details, including buildings that needed more than a standard panel-load check.
  • Work through changes: revised layouts, connections and temporary loads were checked against the assessed structure.
  • Keep the scope clear: project-specific findings and certification identified the conditions covered by the agreed work.

Repeat work brought continuity across the programme while keeping the engineering specific to each store.