Mid-scale solar: what installers need to know about as-built structural reports

If you’re installing an eligible mid-scale solar system and seeking small-scale technology certificates (STCs), the Clean Energy Regulator (CER) requires an as-built structural engineering report.

The as-built structural certification reviews the completed installation against the assessed engineering design to confirm whether it has been installed as designed.

Installers need to plan for the engineering review of the completed installation, including the evidence, costs and timing involved.

Here’s what the requirement means for your project and how Gamcorp can help you prepare.

What the CER requires

  • An as-built structural engineering report is required for eligible mid-scale systems seeking STCs.
  • Mid-scale means more than 100 kW and up to 1 MW, including related solar systems and power stations where applicable. A standalone 100 kW installation is not automatically mid-scale. A smaller installation may be mid-scale when combined with related generation.
  • The scheme changes apply to eligible installations from 1 October 2026.
  • Other requirements also apply, including an electrical single line diagram, a connection agreement and remaining eligibility conditions. A structural report alone does not establish eligibility.

Check the CER requirements, mid-scale guidance and classification guidance for your project.

What an as-built structural report covers

The design assessment looks at what you plan to install. The as-built review considers evidence of what you actually installed against the relevant engineering documents. Confirm whether the completed-installation review is included in your agreed engineering scope.

What installers need to plan for

  • Review the quote and scope early. Allow time to review the engineering quote, confirm what it covers, and discuss the project with the design engineer from the beginning. Agree fees, timing and how the completed-installation review fits into the programme.
  • Plan the review in your project programme. Confirm scope, fees and timing early.
  • Provide installation evidence. Check what existing photos and records are available for the completed work, including any details now concealed.
  • Keep track of changes. Record departures from the assessed design and how they were resolved.
  • Allow time to close out questions. Further information, inspection or corrective work may be needed before a report can be issued.

How Gamcorp can help

Who this service is for: Gamcorp’s as-built structural reporting service is available only for installations where Gamcorp has already issued the Solar Ready certificate.

Our Solar Ready work already considers roofs, mounting systems, fixings, roof connections and installation loads within the agreed scope. Speak with us early so we can establish how the completed-installation review fits into your project.

Involving us early helps establish what needs to be reviewed, what records your installers should provide and how structural reporting fits into the job. We are developing a supporting checklist and reporting process, subject to our engineers confirming the scope and evidence requirements.

  • Clear engineering scope before work starts.
  • Project-specific guidance on the information needed.
  • A clear list of records to provide after installation.
  • Clear next actions where further work is required.

Two stages of structural engineering

1. Solar Ready certification, before installation. We assess the proposed installation and supporting structure within the agreed scope, helping the team understand the structural requirements for installing the system safely and correctly. The resulting engineering documents identify the assessed arrangement and conditions that apply.

NEW
2. As-built structural review, after installation. After installation, the installation team provides the available agreed evidence and the engineer reviews the available records against the relevant engineering documents and determines what further evidence, inspection or corrective work is needed before deciding whether a report can be issued.

The report is prepared after installation. The review considers the agreed structural scope and applicable requirements, including relevant provisions of AS/NZS 5033 for photovoltaic arrays and other applicable structural standards. Engineering will confirm the standards, evidence requirements and reporting scope for each project.

How it works

We plan to provide an online submission tool outlining the project details and records to share with Gamcorp. The tool, its requirements and the review process remain subject to engineering confirmation.

After installation, send Gamcorp the as-built layout and the available records for review. We confirm the scope and evidence required for the project.

  1. Confirm the layout: Provide the updated as-built PV layout, showing rail numbers in the relevant zones, rail and panel types, and installed orientation.
  2. Provide available inspection records: Supply photographs of the rail arrangement and relevant spacings, completed panel installation and torque-check records for connections and clamps, where available. Gamcorp will confirm the details required.
  3. Choose the review: For installations where Gamcorp has already issued the Solar Ready certificate and provided the PV design layout, the proposed pathway is option 1, a desktop review. Gamcorp will confirm the scope and any further information or inspection needed.
  4. Complete the review: Gamcorp checks the records within the agreed scope and identifies any further information, inspection or corrective work needed before the engineer determines whether a report can be issued.

Photographs alone do not establish compliance, remote review may not suit every project, and submitting records does not guarantee a report or STC eligibility. The process and evidence requirements remain subject to engineering confirmation.

Already installing or finished the job?

If Gamcorp has already issued the Solar Ready certificate, contact us and tell us what stage the project has reached and what records are available. We can discuss the information needed and whether further evidence or inspection may be necessary.

Talk to Gamcorp before installation starts

Start the structural reporting conversation early. Discuss your project with Gamcorp to confirm the scope, understand what records your team needs to provide and allow for the completed-installation review in your project.

Find The Relevant Structural Service.

Back To All Articles

More To Explore

Solar Ready, explained by Martin Gamble

13 November 2026

Read Article