Sunlock offers NOVA carports alongside its Sunlock commercial carport solutions. Our role is the structural engineering: system design, drawings, frame assessment and foundation certification within each agreed commission.
Result for Sunlock and project teams
Clear structural requirements for the proposed carport.
Sunlock and its project teams gained structural designs, drawings and defined frame and footing requirements to develop the assessed carport systems and plan site-specific installations.
- Develop the system with an assessed structural arrangement.
- Coordinate the project using drawings and connection details.
- Plan the installation around site-specific frame and footing requirements.
Why the engineering matters
The panels are only part of the structure.
The canopy, steel frame, connections and foundations have to work together. Wind region, site exposure and the shape of the carport influence the loads the structure needs to resist.
Checking these together gives the project team a basis for sizing the steelwork, coordinating details and identifying what needs to be confirmed for each site.
What we helped resolve
From the canopy to the ground.
Our completed engineering commissions for Sunlock, including NOVA carport work, covered these four areas.
Carport system design
Residential design checks and single- and double-sided commercial system design resolved structural members, connections and foundation options. Structural drawings documented the assessed commercial designs.
Frame and connection coordination
Reviewing cantilever members, columns and connections together helped define how the supporting frame works as a whole, giving project teams structural details to coordinate.
Site-specific array-frame assessment
Structural assessment and array-frame certification defined requirements for proposed carport systems at a particular site, giving the installation team conditions to plan around.
Footing assessment and certification
Foundation assessment connected the loads from the frame to the proposed footing arrangement. Certification recorded the assessed foundation and the conditions for its use.
The completed work also included preliminary design, issued-for-construction documentation, construction-phase services and civil design within the relevant commission.