Celebrating 50 Years
Solar Verified

Solar Verified. As-built structural engineering reports.

The second step in the Solar Ready program. After installation, Gamcorp assesses the completed work against the engineering design for an as-built structural engineering report.

An as-built structural engineering report, after installation.

Solar Ready assesses the proposed installation before it is built. Solar Verified brings the completed installation back to the same engineering pathway, so a Gamcorp engineer can assess the available records against the relevant design documents.

Design and installation evidence

Assess the updated as-built PV layout, installation photographs and agreed supporting records against the Gamcorp engineering documents.

Changes and outstanding questions

Identify departures from the assessed design and any further evidence, inspection or corrective work needed.

The engineering report

The engineer determines whether an as-built structural engineering report can be issued within the agreed scope.

Who it is for: installations where Gamcorp has already issued the Solar Ready certificate. If your installation does not have one, discuss the appropriate engineering pathway with Gamcorp.

The assessment considers the agreed structural scope and applicable standards, including relevant provisions of AS/NZS 5033. Photographs alone do not establish compliance, and remote assessment may not suit every project. Submission does not guarantee a report or STC eligibility.

For eligible mid-scale systems seeking STCs, read what the CER reporting requirement means for installers ↗.

Solar Verified pricing.

Pricing for Solar Verified is based on system size. Confirm the agreed scope and fee before commissioning the service. Solar Ready certification is a separate stage.

System sizePrice
Up to 250 kW$850
Over 250 kW to 500 kW$1,350
Over 500 kW to 750 kW$1,800
Over 750 kW to 1 MW$2,800

Any further evidence, inspection or corrective work needed is identified through the engineering assessment. The project quote confirms the work covered.

From your brief to engineering documents.

  1. Confirm the scope

    Contact Gamcorp with your Solar Ready certificate and job number. Confirm the fee, evidence requirements and timing for the post-installation report.

  2. Share the completed installation details

    Provide the site, installer and installed system information after installation.

  3. Provide the updated as-built PV layout

    Identify any changes from the assessed design.

  4. Provide photographs and supporting records

    Share the available installation photos and agreed records, including relevant connection checks.

  5. Receive the engineering assessment

    Gamcorp assesses the records against the engineering documents, identifies outstanding requirements and determines whether the as-built structural engineering report can be issued.

The scope, fee, required information and delivery timing are agreed before engineering work proceeds. Documents apply to the assessed arrangement and conditions.

We are developing an online submission tool: scan a QR code or open the supplied link, add the project details and attach photos and records. The tool is not yet available. Contact Gamcorp to arrange your Solar Verified scope and submission pathway; evidence requirements remain subject to engineering confirmation.

Make the next structural decision clear.

Send the project information

  • Gamcorp job number and Solar Ready certificate reference
  • Site address, installer details and installed system size
  • Updated as-built PV layout identifying changes from the assessed design
  • Available installation photographs, connection-check records and other agreed supporting evidence

Missing a drawing or detail? Tell us what is available so we can identify the next information needed.

Confirm your scope and fee

Share your project stage, the decision you need to make and your required timing.

Discuss Solar Verified

Search the site

Quick links