ResultSunergise could plan roof fixings and temporary panel storage around tested connection limits on the Daniell and Paykel buildings.
How we helped
Plan for the roof, fixings and installation loads.
Roof Sheet Testing
We assessed the roof and clamp connections using pull-test results supplied by Sunergise. The findings informed the installation requirements.
Pallet Load Assessment Certificate
We checked temporary panel storage loads and specified where pallets could sit, how they should be supported and how to spread their weight.
Solar Ready Certification
We checked the existing roofs and proposed solar mounting system, then issued structural certificates with installation conditions for both buildings.

Findings & Solutions
Check The Whole Connection.
A strong solar clamp is only part of the picture. We needed to check how the load passed through the roof connections to the supporting steel.
What The Tests Revealed
In six controlled pull tests, the nylon roof clip cracked before the solar clamp disengaged. This showed why the roof connection needed to be assessed alongside the clamp.
How We Used The Findings
Our calculations identified the screw connection to the roof steel as the limiting part of the installed arrangement. We used that limit to set the required rail and fixing layout.
Planning For Panel Storage
Pallets add concentrated weight before the panels are installed. We checked the supporting roof structure and documented pallet positions and load-spreading requirements.
Concept illustrations of the assessment process.
Project Partners
Working With Sunergise & Clenergy.
Sunergise delivered the campus solar installation using Clenergy rails and panel clamps. The roof fixings differed between the two buildings, so Gamcorp checked each arrangement.
The Daniell building used S-5 roof clamps; the Paykel building used fixings through the roof. Our assessment covered the connections as well as the mounting frame.
Explore Clenergy SolarRoof
Installation Progress
See The Scale Take Shape.
Sunergise delivered the installation over nine months. These aerial views show the Daniell and Paykel rooftops before, during and after the work.
September 2025

Before The Arrays
The roof layout before the panel arrays took shape.
January 2026

Installation Underway
The first panel arrays are visible across both buildings.
August 2026

The Completed Arrays
Solar panels now cover large areas of both rooftops.
Imagery: Google. Installation duration: Sunergise.
Result for the client
Plan fixings and panel storage around the tested roof
Sunergise gained the structural requirements for installing solar and temporarily storing panels on the Daniell and Paykel buildings. Testing and assessment turned connection and loading questions into documented installation conditions.
- Use the tested connection limit: pull tests and calculations informed the rail and fixing arrangement, rather than relying on clamp strength alone.
- Plan temporary storage: the pallet assessment set out where panels could sit, how they should be supported and how to spread their weight.
- Work from building-specific conditions: structural certificates documented the assessed roof and mounting requirements for each building.
This gave Sunergise a structural basis for the assessed installation and storage arrangements. The work covered the two named buildings within the wider 5.3 MWp campus project.