For STC eligibility, the Clean Energy Regulator (CER) requires eligible rooftop solar systems of more than 100 kW and up to 1 MW (a mid-scale system), installed from 1 October 2026, to have an as-built structural engineering report before small-scale technology certificates (STCs) can be created for it. STCs usually lower the upfront price of a solar system, so the report now sits between the installation and that saving.
Before installation, Gamcorp’s Solar Ready certificate sets out how the panels must be fixed: the rails, how they attach to the roof, and the closer spacing needed near roof edges and corners, where wind loads are highest. The as-built structural report checks that the system was installed as designed. A Gamcorp engineer reviews evidence from the site and signs the report.
In short: the design certificate says how the system should be built. The as-built structural report confirms that it was built that way.