Celebrating 50 Years
Installation Ready

Installation Ready

ANZ compliance flywheel.

Assess your equipment, brackets and fixings with Installation Ready, then use that engineering as a starting point for each project in Australia and New Zealand.

The approach

Product assessment first. Site checks for each installation.

If you supply the same equipment across multiple projects, Installation Ready gives your team a documented starting point for each one.

Australia and New Zealand have different requirements. The standards, jurisdictions and deliverables are confirmed for the agreed scope and the intended markets.

How it works

How the Installation Ready flywheel works.

Assess the product first. Reuse the engineering. Check each installation.

Product engineeringBuild the ANZ Access Pass
  1. Share product details. Send drawings, loads, proposed brackets and fixings, intended uses and target markets.
  2. Assess the product. Gamcorp confirms the scope and fee, then assesses the product and mounting arrangements covered by the agreed work.
  3. Document conditions and limits. Gamcorp records the assessed arrangements, assumptions and limits in the agreed engineering documents.
Installation Ready Start hereANZ Access PassReusable product documents

Site engineeringEvery new
installation

Check the site

Gamcorp checks the proposed equipment, fixings and supporting structure against conditions at that site. Send the location, layout, fixing details and available structural drawings.

Reuse documents

Bring the product documents to the next project. Gamcorp checks which details still apply and assesses changes within the new project scope.

Repeat on the next project

Each installation still needs engineering checks for its site.

The certificate

What the Installation Ready certificate covers.

Where certification is included in the agreed work, the Installation Ready certificate documents the engineer’s assessment for the stated scope and conditions. It helps manufacturers and project teams communicate the assessed arrangement and identify what needs to be checked before relying on it for a particular installation.

It does not, by itself, approve every installation or replace required site-specific engineering, building approvals or construction sign-off. The documents and acceptance process depend on the project, location and relevant authority. For example, a New Zealand producer statement is a professional opinion that a council may consider; it is not a guarantee of compliance. Read New Zealand guidance on producer statements ↗

Next steps

Start with your product or a specific site.

For repeat installations, send your product details and intended markets. If you already have a project, include the site information and any existing product assessment. Gamcorp will confirm the engineering scope and fee.

Search the site

Quick links