Solar Verified webinar.

Your recording, presentation slides and installer checklists for mid-scale solar as-built structural engineering reports.

Presented by Sanna Afshar, Director of Operations, with the Gamcorp team.

Watch again

The webinar recording.

Mid-scale solar reporting

Having trouble playing the recording?

Open the recording in Google Drive. If Drive reports that the video is still processing, please try again shortly.

Download and share

Slides and checklists.

Use the checklist for your confirmed option and system size. The Solar Verified checklists and guidance page holds the maintained documents and detailed process.

The essentials

What matters for your project.

  • Check eligibility. Eligible mid-scale systems installed from 1 October 2026 need an as-built structural engineering report for STCs. Mid-scale means more than 100 kW and up to 1 MW in total, including related solar generation where applicable.
  • Use your Gamcorp design. Solar Verified is for installations with a Gamcorp-issued Solar Ready certificate.
  • Plan the photos early. Capture rail and roof-connection evidence before panels cover them. The engineering assessment and report follow installation.

Solar Ready, before installation

The structural assessment and design certification establish the requirements for the assessed roof, mounting system and installation.

Explore Solar Ready

Solar Verified, after installation

A Gamcorp engineer assesses the installation evidence against the Gamcorp design before deciding whether an as-built structural engineering report can be issued.

Solar Verified and pricing

Gamcorp’s checklists describe our evidence process, not a CER-prescribed photo schedule. Scope, evidence sufficiency and report issue remain subject to engineering confirmation. A report does not guarantee STC eligibility. Check the CER system classification guidance and current eligibility requirements for your project.

Choose with Engineering

Two desktop options. Different evidence.

The webinar called these Options A and B. The downloadable checklists use Option 1 and Option 2. Both are for installations covered by a Gamcorp-issued Solar Ready certificate.

Option 1: Desktop Review

Provide an updated as-built PV layout showing the actual arrangement, rail requirements, fixing spacings and any changes from the assessed design. Supply the supporting photos and torque-check records in the checklist.

Get the Option 1 checklist

Option 2: Full Inspection Desktop Review

For projects without an as-built PV layout. More detailed measured photo evidence and a location legend are required, including changes in spacing and the relevant roof zones.

Get the Option 2 checklist

Need someone to inspect the site? A separately scoped site inspection was also discussed as Option C. Contact Gamcorp to discuss the project, access, timing and fee. This is distinct from the two desktop checklist options.

Put it into practice

Plan the evidence before the work starts.

  1. Confirm your scope

    Send your Gamcorp job number, Solar Ready certificate, site address, system size and project stage. Allow time to review the quote and agree the evidence option with Engineering.

  2. Capture the rails before panels go on

    Follow your checklist for rails, roof fixings, changes in spacing and rail overhangs. Record the specified torque checks against the manufacturer’s requirements.

  3. Document the finished installation

    Collect the finished-array photos and panel-clamp torque records. For Option 1, provide the updated as-built PV layout and clearly identify changes from the assessed design.

  4. Arrange the engineering assessment

    Contact Gamcorp to provide the evidence. The engineer may request further information, inspection or corrective work before deciding whether to issue the report.

The online submission tool is not open to customers yet. Do not rely on a checklist QR code as a working upload pathway. Contact Gamcorp to agree how to send your evidence. If the installation is already complete and evidence is missing, discuss it with us before arranging further site work.

From the Q&A

Questions installers asked.

Can Gamcorp report on another engineer’s design?

Solar Verified is available only where Gamcorp has issued the Solar Ready certificate for the installation. For another engineer’s design or a general product certificate, contact the original engineer and discuss the site-specific assessment required.

What needs to be on the as-built PV layout?

Show what was actually installed: the array layout, rail requirements and fixing spacings for the relevant roof zones, products and orientation, and any departures from the assessed design. Follow the Option 1 checklist and confirm project-specific requirements with Engineering.

How many photos and torque checks do we need?

Use the current checklist for your option and system size. The webinar discussed a minimum 5% torque spot check across the relevant connections. The checklists explain the samples and records; issues found during checking may require further investigation. Use the frame manufacturer’s specified torque values.

Does a general mounting-system certificate cover the building?

A product certificate addresses the assessed mounting components and their stated limits. Do not assume it also assesses the supporting roof or establishes suitability for your site. Confirm what the project’s structural documentation actually covers.

How long will the report take, and what will it cost?

See the published Solar Verified pricing, then confirm the option, scope, fee and timing with Gamcorp. Evidence quality, missing records, design changes and any further inspection affect the work needed. No universal completion time was agreed in the webinar.