Installation Ready · Australia

Ventia — Cell On Wheels

Structural Support For Temporary Mobile Networks.

Ventia needs to deploy temporary mobile towers around different equipment, wind and ground conditions. Gamcorp helps define the structural setup for each assessed deployment and provides installation certification where it forms part of the agreed scope.

Client
Ventia
Network provider
Optus
Gamcorp service
Installation Ready
Work
Assessment & installation certification
Optus systems at the 2026 Australian Grand Prix
2

The two-system figure relates to the Albert Park project described below.

Example of a Cell on Wheels unit, shown for context. Image: ICS Industries.

ResultVentia gained unit-specific installation conditions and structural sign-off for two Optus Cell on Wheels systems at the 2026 Australian Grand Prix.

The Need

Temporary Towers. Site-Specific Engineering.

A Cell on Wheels, or COW, is a transportable mobile base station. Ventia deploys these systems where extra network coverage is needed, including major events.

Moving the same unit to another location changes the structural conditions. Wind exposure, antenna equipment and the ground beneath the supports all affect how it needs to be installed.

How we helped

Define the setup for each deployment.

The Mast & Antennas

Assess the mast and antenna-supporting frame against the proposed equipment and wind conditions for the deployment.

The Stabilising System

Check the support arms, bracing cables and ballast weights, along with the ground support needed to keep the unit stable.

The Installation

Inspect the installed arrangement against the structural documents and issue installation certification for the assessed scope.

A Project Example

Two Systems At The Australian Grand Prix.

At Albert Park for the 2026 Australian Grand Prix, Gamcorp assessed two Optus COW systems for Ventia. Each had its own mast, antenna arrangement and stabilising requirements.

Our work included structural calculations and design certification, followed by installation certification for both systems. The installation certificates were issued in March 2026.

Engineering In Practice

Check The Whole Setup.

Different Units Need Different Conditions

The two Grand Prix systems required different ballast arrangements. We assessed each unit separately rather than applying one setup to both.

The Ground Is Part Of The Structure

The assessment specified ground support and bearing requirements alongside the mast and ballast. A transportable system still depends on the site beneath it.

Design & Installation Are Separate Checks

The design certificate defines the assessed arrangement and conditions. The installation check confirms that the deployed unit follows those documents.

Across Australia

Events We’ve Supported.

Ventia’s Cell on Wheels deployments supported by Gamcorp structural assessment and certification include:

  • Australian Grand Prix
  • Adelaide 500
  • Melbourne Cup
  • The Everest
  • Newcastle V8 race
  • LIV Golf Adelaide
  • City2Surf
  • Avalon Airshow
  • Royal Melbourne Show
  • Listen Out
  • Splendour in the Grass
  • Laneway Festival Sydney
  • Beyond the Valley
  • St Kilda Festival
  • Spilt Milk Canberra
  • Sydney New Year’s Eve celebrations
  • Falls Festival
  • Electric Gardens

Our scope varies by deployment, from structural assessment and design certification to installation checks. Ventia installs the systems and Optus provides the network.

Result for the client

Deploy temporary towers to site-specific structural requirements

Ventia gained the structural documentation and installation certification for two Optus Cell on Wheels systems at the 2026 Australian Grand Prix. Each unit was assessed against its own equipment, support arrangement and site conditions.

  • Set up each unit correctly: the engineering defined the relevant mast, support, bracing and ballast arrangement.
  • Account for the ground beneath it: bearing and ground-support requirements formed part of the assessed installation conditions.
  • Confirm the installed arrangement: installation certification completed the structural sign-off for the agreed scope of both units.

Ventia installs the systems and Optus provides the network. Gamcorp’s contribution was the structural assessment and certification supporting those deployments.

For background on the network delivery partnership, see Ventia’s Optus Wireless Project.