Single site
$450AUD
Per installation, covering structural analysis and certification for the agreed scope.
Engineering services
View all servicesCertification and clear pricing for installers. Roof assessments for building owners.
Commercial solar installersBuilding & portfolio ownersResidential solarProduct certificationGround-mount solarMore Solar Ready servicesPricing calculatorDesign and certification around your product, its loads and intended use.
Skid base designLifting certificationCustom steel structuresTelecom foundation designPortable cabinetsLight-gauge steel designPricing and scopeEngineering advice for safe, correct installation of products and equipment.
Equipment installationsBrackets and fixingsSupporting structuresProduct and site assessmentPricing and scopeProject information checklistInstallation guideNot sure where to start?
Start your projectProjects by service
View all projectsResidential solar / New Zealand
For installers preparing solar on single-dwelling homes. Assess the roof structure and proposed mounting arrangement before installation.
The engineering scope
Assess the roof, proposed solar array and connections, then provide structural documentation for the agreed scope.
New roof-mounted solar consent exemptions took effect on 23 October 2025. Eligible work still needs to comply with the Building Code, local district plan and exemption conditions.
The array size and wind conditions affect whether Chartered Professional Engineer design or review is required.
Read the New Zealand exemption guidanceFees & scope
Residential pricing applies to single-dwelling sites up to 15 kW. Prices are in Australian dollars.
Confirm the installation’s eligibility, document coverage and any additional work with Gamcorp before purchasing. Delivery timing is agreed for your project.
Engineering in practice
Project example
Roof sheet testing and assessed pallet loads gave the project team building-specific installation requirements.
Read the projectProject example
Structural findings and certification helped plan solar across 42 assessed New Zealand sites, including 24 schools.
Read the projectThe process
Send the available records, proposed arrangement and what you need to resolve.
Receive a quote defining the work, documents, exclusions and delivery timing.
Use the findings, design requirements and certification included in the agreed scope.
The scope, fee, required information and delivery timing are agreed before engineering work proceeds. Documents apply to the assessed arrangement and conditions.
Start with what you have
Missing a drawing or detail? Tell us what is available so we can identify the next information needed.
Share your project stage, the decision you need to make and your required timing.
Start your project