Celebrating 50 Years
Solar Ready

Residential solar / New Zealand

Residential solar certification in New Zealand.

For installers preparing solar on single-dwelling homes. Assess the roof structure and proposed mounting arrangement before installation.

The engineering scope

Assess the roof and proposed mounting.

Assess the roof, proposed solar array and connections, then provide structural documentation for the agreed scope.

  • Roof capacity. Review the available construction information and proposed solar loads.
  • Mounting and fixings. Assess the arrangement for the site and relevant wind and seismic requirements.
  • Engineering documents. Receive structural analysis and certification for the installation assessed, with the scope identified.
Approvals and structural requirements

New roof-mounted solar consent exemptions took effect on 23 October 2025. Eligible work still needs to comply with the Building Code, local district plan and exemption conditions.

The array size and wind conditions affect whether Chartered Professional Engineer design or review is required.

Read the New Zealand exemption guidance

Fees & scope

Confirm the work before commissioning it.

Residential pricing applies to single-dwelling sites up to 15 kW. Prices are in Australian dollars.

Single site

$450AUD

Per installation, covering structural analysis and certification for the agreed scope.

10-site bundle

$3,600AUD

Pre-purchase 10 site credits and use them as eligible projects arise.

$360 per site · $900 less than 10 individual sites.

Confirm the installation’s eligibility, document coverage and any additional work with Gamcorp before purchasing. Delivery timing is agreed for your project.

Engineering in practice

Related commercial solar work.

The process

From your brief to engineering documents.

  1. Share the information

    Send the available records, proposed arrangement and what you need to resolve.

  2. Agree the scope and fee

    Receive a quote defining the work, documents, exclusions and delivery timing.

  3. Receive the engineering documents

    Use the findings, design requirements and certification included in the agreed scope.

The scope, fee, required information and delivery timing are agreed before engineering work proceeds. Documents apply to the assessed arrangement and conditions.

Start with what you have

Make the next structural decision clear.

Send the project information

  • Completed residential checklist and proposed panel layout
  • Roof construction and mounting details
  • Site photographs and available roof records

Missing a drawing or detail? Tell us what is available so we can identify the next information needed.

Confirm your scope and fee

Share your project stage, the decision you need to make and your required timing.

Start your project

Search the site

Quick links